Peninsula Link – Project Profile

April 5, 2018

Penlink-01

Project overview

Peninsula Link, the 27-kilometre road link between the EastLink Freeway at Carrum Downs and the Mornington Peninsula Freeway at Mount Martha in Victoria was constructed between March 2011 and January 2013 by infrastructure giant Abigroup (now Lend Lease Group).

The $759 million project brought many benefits to people living, working and visiting Frankston and the Mornington Peninsula. Peninsula Link has saved people time, with a full trip between Mt Martha and Carrum Downs taking just 17 minutes – a saving of up to 40 minutes in peak traffic.

Recycled products used in the construction of Peninsula Link

In March 2011, Alex Fraser successfully tendered for the supply of Class 3 and 4 recycled concrete and the first truck loads arrived in November 2011.

Peninsula Link was completed in January 2013 and Alex Fraser played a significant role, supplying approximately 300,000 tonnes of recycled road base.

The following aspects played a large role in awarding the tender:

  • Location: most materials for this project were supplied from Alex Fraser’s Clarinda production facility. Its close proximity to the construction site allowed for competitive freight costs
  • Capability: Alex Fraser sites had the well-proven capacity to produce and supply the large volumes of recycled concrete required for the project
  • Quality products: Alex Fraser had supplied high-quality tested and specified Class 3 and 4 road base and aggregates to other projects of similar size
  • Logistics: Alex Fraser had a proven capability to schedule and deliver the required 3,000 tonnes per day.

Cost and carbon savings

Choosing Alex Fraser recycled materials resulted in a saving of 26,000 tonnes of material, or 644 less truck loads, and a carbon saving of approximately 1,958 tonnes.